Installation Instructions: Prepare the soil by clearing debris, tilling 4-6 inches deep, and leveling 1 inch below sidewalks for drainage. Lay sod along a straight edge (e.g., driveway), staggering seams in a brick-like pattern by starting each row with a half-piece (e.g., 1-foot piece for 2-foot rolls). Fit pieces tightly without overlapping, trim edges with a sharp knife, and roll with a lawn roller for soil contact. Water immediately to start rooting. Install within 12-24 hours of delivery to avoid drying out.
Watering Instructions: In Phoenix and Tucson’s arid climate, water bermudagrass sod 4-5 times daily (1/8 inch per session) for 7-10 days in summer; 3 times daily in winter. After roots anchor (check by lifting a corner), water 1/4 inch daily, then 3/8 inch every other night, and finally 4/10 inch every third day in summer. For bluegrass, use 3-4 times daily initially. Avoid nighttime watering to prevent fungal issues. After 3-4 weeks, water 1-2 times weekly, applying 1-1.5 inches to penetrate 4-6 inches deep. Adjust based on soil and weather.
